Showing posts with label Southbound 405. Show all posts
Showing posts with label Southbound 405. Show all posts

Aug 14, 2008

The Start of The Wilburton Tunnel Demo

Here is the Wilburton Tunnel dug out the day before demo. Crews worked two weeks digging out the dirt exposing the side walls that were previously covered, preparing for the demo.

This is the aftermath of a 24 hour demo period. Two thirds of the tunnel was demoed in the first weekend.

Here you can see the top two thirds of the tunnel has been removed, and, they moved to taking down the side walls.

Here is the mad dash to get the road cleaned up before 5 am, for Monday morning traffic.


(photos courtesy of,Mannie Barns)

(Wilburton Tunnel After)

Can you tell that there was total chaos over the weekend? Only a third of the tunnel remains to be removed by the weekend of August 15-17th.

You can view more photos on the removal of the Wilburton Tunnel on Flicker Here:

Wilburton Tunnel Demo

Aug 8, 2008

Pre Demolition of WilburtonTunnel

Contractors moving in the heavy artillery for attack on the Wilburton tunnel. Follow up Photos of the aftermath will be posted shortly! Stay away from Southbound 405 South of Bellevue this weekend and next!


An aerial view of the Wilburton Tunnel shows trucks removing dirt in
preparation for the assault.

Jun 9, 2008

NiGhT CrEw...


(Photos courtesy of Bill Miller)

Setting the Girders over Southbound 405 over I-90 at night, due to freeway shut downs. The crane in this picture is a 500 ton, the other crane you don't see is the 450 ton. These are used to pick and set girders that weigh approximately 180,000 lbs. a piece. When project is complete this will be the new overpass for Southbound 405 over I-90.