Showing posts with label crane. Show all posts
Showing posts with label crane. Show all posts

Oct 8, 2009

Chilly Work

Construction of a dock up in Bellingham Washington, pilebucks are signaling an operator to set the vibro hammer on the pile.



(Pictures of the Crane that my buddy runs)

These may look like pretty awesome pictures of the snow but, try working in it!
At least snow is better than Rain!

(photos Courtesy of Mike Mcbride)

Oct 16, 2008

another crane collapse

This accident happened in Australia. This crane is only 9 days old and cost the company $4mill! The price doesn't include all the damage to the new building. The good news is that nobody was killed or seriously injured. The crane balanced in the air for about 1 hour before the entire rig finally fell thru the floor. The boom layed across the site and then the crane fell all the way to the basement. This accident could have been avoided with the proper planning.

Aug 21, 2008

Big Crane Pick

The big steel structure in these pictures is called the Aqueduct bridge. It is located in the little town of Lowell in Snohomish Co. The structure is only a pedestrian bridge that spans railroad tracks. The big hole in the center is for water run off from the streets and I-5. The water runs thru the bridge and comes out the other side to a water feature on the backside(the hole in the concrete wall in the back of the pic).
The bridge its self is about 180 feet long and weights a shit load! The crane used to pic this is a 400 ton mobile crane, pretty awesome.
(photos courtesy of Manny Barns)

Jul 18, 2008

Night Crew in Progress...

This is my crew and, I drilling shafts, 30 feet deep with our low drill and, then setting our piling which are 40 feet long with our 60 ton crane. This is temporary shoring to hold back, I-405.


Jul 11, 2008

Here We Go Again...Another Freakin Night Show!


Working nights once again! In this picture you can see the drill rig, we use this to drill temporary shoring. (Made of steel H-pile, with one inch thick, steel plates in between.) These hold the dirt back so we can dig down along the side of the road. This is the construction of a new retaining wall for a new off ramp off I-405.
This pictures shows the 60 ton crane which we use to set the pile.

These are the pile that have been set 30 feet into the ground.
Here we are back filling the temporary shoring.
We use pea gravel in most areas for easy removal of the temp. shoring. Other times we use CDF which is, a sand, cement mix with little amount of cement. This just fills the voids around the pile to hold them into place.
(Photos courtesy of Smashedthumbs)