Oct 8, 2009

Chilly Work

Construction of a dock up in Bellingham Washington, pilebucks are signaling an operator to set the vibro hammer on the pile.



(Pictures of the Crane that my buddy runs)

These may look like pretty awesome pictures of the snow but, try working in it!
At least snow is better than Rain!

(photos Courtesy of Mike Mcbride)

Oct 16, 2008

another crane collapse

This accident happened in Australia. This crane is only 9 days old and cost the company $4mill! The price doesn't include all the damage to the new building. The good news is that nobody was killed or seriously injured. The crane balanced in the air for about 1 hour before the entire rig finally fell thru the floor. The boom layed across the site and then the crane fell all the way to the basement. This accident could have been avoided with the proper planning.

Sep 14, 2008

CRANE COLLAPSE

Here are a few pics of a piledriving crane that has collapsed. The reason for the collapse is still under investigation but it is thought that the boom failed. No one was hurt but work has been halted until the investigation is complete and new equipment is brought in. Being around a piledriver crane when it goes over is no fun, I was standing about 15 feet from a rig when it went over! What a big mess to clean up not to mention the money for new equipment. The big pipe in the mess is the pile that was going to be driven into the ground. In the second pic you'll see the piledriving hammer which hammers the pile into the ground. The crane in the third pic looks like it is popping a wheelie, but in fact the weight of the boom, leads, and pile are holding it up.


Aug 28, 2008

Looking for a Few Good Photos & Stories!

Me in the trenches
I'm just putting the word out for anyone who is interested! I would like to show the world all the hard work that we do! Have some pictures and/or stories you would like to share? Email me at: Smashedthumbs@yahoo.com and, I will give you credit! C'mon it's not the hard! And, why your at it leave me some comments!

Aug 21, 2008

Big Crane Pick

The big steel structure in these pictures is called the Aqueduct bridge. It is located in the little town of Lowell in Snohomish Co. The structure is only a pedestrian bridge that spans railroad tracks. The big hole in the center is for water run off from the streets and I-5. The water runs thru the bridge and comes out the other side to a water feature on the backside(the hole in the concrete wall in the back of the pic).
The bridge its self is about 180 feet long and weights a shit load! The crane used to pic this is a 400 ton mobile crane, pretty awesome.
(photos courtesy of Manny Barns)

Aug 16, 2008

First Email Submission on Job Site Photos!

Here is what will become the new South-bound lanes of 405 going over I-90 Bellevue. Looking at the bridge deck laid out before rebar & concrete.

I would like to thank our first submission of construction photos by email!
(photos curteousy of Karen Andrews)

Aug 14, 2008

The Start of The Wilburton Tunnel Demo

Here is the Wilburton Tunnel dug out the day before demo. Crews worked two weeks digging out the dirt exposing the side walls that were previously covered, preparing for the demo.

This is the aftermath of a 24 hour demo period. Two thirds of the tunnel was demoed in the first weekend.

Here you can see the top two thirds of the tunnel has been removed, and, they moved to taking down the side walls.

Here is the mad dash to get the road cleaned up before 5 am, for Monday morning traffic.


(photos courtesy of,Mannie Barns)

(Wilburton Tunnel After)

Can you tell that there was total chaos over the weekend? Only a third of the tunnel remains to be removed by the weekend of August 15-17th.

You can view more photos on the removal of the Wilburton Tunnel on Flicker Here:

Wilburton Tunnel Demo

Aug 8, 2008

Pre Demolition of WilburtonTunnel

Contractors moving in the heavy artillery for attack on the Wilburton tunnel. Follow up Photos of the aftermath will be posted shortly! Stay away from Southbound 405 South of Bellevue this weekend and next!


An aerial view of the Wilburton Tunnel shows trucks removing dirt in
preparation for the assault.

Jul 18, 2008

Night Crew in Progress...

This is my crew and, I drilling shafts, 30 feet deep with our low drill and, then setting our piling which are 40 feet long with our 60 ton crane. This is temporary shoring to hold back, I-405.


Jul 11, 2008

Here We Go Again...Another Freakin Night Show!


Working nights once again! In this picture you can see the drill rig, we use this to drill temporary shoring. (Made of steel H-pile, with one inch thick, steel plates in between.) These hold the dirt back so we can dig down along the side of the road. This is the construction of a new retaining wall for a new off ramp off I-405.
This pictures shows the 60 ton crane which we use to set the pile.

These are the pile that have been set 30 feet into the ground.
Here we are back filling the temporary shoring.
We use pea gravel in most areas for easy removal of the temp. shoring. Other times we use CDF which is, a sand, cement mix with little amount of cement. This just fills the voids around the pile to hold them into place.
(Photos courtesy of Smashedthumbs)

Jul 7, 2008

What is a Piledriver?

Someone may ask "What is a piledriver?" This is a question that I've tried to explain too many times to remember. This is my job, this is what I do! It's not a wresting move or a sexual position either so, get your mind out of the gutter!
The title "piledriver" is given to any member of the construction crew that work with the pile driving rigs. The actual piledriver rig is a vessel that drives piles into the the soil to provide the stability and, foundation for structures such as over passes, buildings, bridges or what have you. Pile drivers have a heavy weight placed between guides so that it can slide up and down in a fluid solid line. (Again, get your minds out of the gutter!) This is placed a top the pile and when the weight is raised to its highest point it is released thus, smashing the pile, driving it into the ground.
There, its that simple,
Piledrivers drive it Deeper!

Jun 25, 2008

Follow Up Work on Girder Setting over I-90

After several weeks the girders are finally in place over I-90.
It took approximately 8 nights to set four spans equaling thirty two girders, with only sixteen left to set. As of now we are working on top of this bridge forming the deck soffit. (the form that holds the concrete.) These forms will allow the pouring of concrete to develop the roadway.

"A bums point of view" ~ ahhh home sweet home!
photos courteous of Matt Elder

Jun 14, 2008

It's All in a Day's Work!

Working on yet another Saturday!

I-405 over I-90

Using a PC-800 excavator where a crane can't fit. Pulling temporary shoring sheets that were holding up 405. Notice how big this rig is compared to the (white) semi truck!

We used the PC-800 to vibro out the temp 40 ft. shoring pile.

Pulling the 8x14 sheets

(Photos courtesy of Matt Elder)

Jun 9, 2008

NiGhT CrEw...


(Photos courtesy of Bill Miller)

Setting the Girders over Southbound 405 over I-90 at night, due to freeway shut downs. The crane in this picture is a 500 ton, the other crane you don't see is the 450 ton. These are used to pick and set girders that weigh approximately 180,000 lbs. a piece. When project is complete this will be the new overpass for Southbound 405 over I-90.