Construction of a dock up in Bellingham Washington, pilebucks are signaling an operator to set the vibro hammer on the pile. Oct 8, 2009
Chilly Work
Construction of a dock up in Bellingham Washington, pilebucks are signaling an operator to set the vibro hammer on the pile. Oct 16, 2008
another crane collapse
Sep 14, 2008
CRANE COLLAPSE




Aug 28, 2008
Looking for a Few Good Photos & Stories!
Me in the trenchesAug 21, 2008
Big Crane Pick
The big steel structure in these pictures is called the Aqueduct bridge. It is located in the little town of Lowell in Snohomish Co. The structure is only a pedestrian bridge that spans railroad tracks. The big hole in the center is for water run off from the streets and I-5. The water runs thru the bridge and comes out the other side to a water feature on the backside(the hole in the concrete wall in the back of the pic).
The bridge its self is about 180 feet long and weights a shit load! The crane used to pic this is a 400 ton mobile crane, pretty awesome.
(photos courtesy of Manny Barns)Aug 16, 2008
First Email Submission on Job Site Photos!
Here is what will become the new South-bound lanes of 405 going over I-90 Bellevue. Looking at the bridge deck laid out before rebar & concrete.(photos curteousy of Karen Andrews)
Aug 14, 2008
The Start of The Wilburton Tunnel Demo
This is the aftermath of a 24 hour demo period. Two thirds of the tunnel was demoed in the first weekend.
Here you can see the top two thirds of the tunnel has been removed, and, they moved to taking down the side walls.
Here is the mad dash to get the road cleaned up before 5 am, for Monday morning traffic.
(photos courtesy of,Mannie Barns)
(Wilburton Tunnel After)
Can you tell that there was total chaos over the weekend? Only a third of the tunnel remains to be removed by the weekend of August 15-17th.
You can view more photos on the removal of the Wilburton Tunnel on Flicker Here:
Aug 8, 2008
Pre Demolition of WilburtonTunnel
An aerial view of the Wilburton Tunnel shows trucks removing dirt in
preparation for the assault.
Jul 18, 2008
Night Crew in Progress...
This is my crew and, I drilling shafts, 30 feet deep with our low drill and, then setting our piling which are 40 feet long with our 60 ton crane. This is temporary shoring to hold back, I-405.
Jul 11, 2008
Here We Go Again...Another Freakin Night Show!



Jul 7, 2008
What is a Piledriver?
Someone may ask "What is a piledriver?" This is a question that I've tried to explain too many times to remember. This is my job, this is what I do! It's not a wresting move or a sexual position either so, get your mind out of the gutter!The title "piledriver" is given to any member of the construction crew that work with the pile driving rigs. The actual piledriver rig is a vessel that drives piles into the the soil to provide the stability and, foundation for structures such as over passes, buildings, bridges or what have you. Pile drivers have a heavy weight placed between guides so that it can slide up and down in a fluid solid line. (Again, get your minds out of the gutter!) This is placed a top the pile and when the weight is raised to its highest point it is released thus, smashing the pile, driving it into the ground.
There, its that simple,
Piledrivers drive it Deeper!
Jun 25, 2008
Follow Up Work on Girder Setting over I-90
Jun 14, 2008
It's All in a Day's Work!
Working on yet another Saturday!
Using a PC-800 excavator where a crane can't fit. Pulling temporary shoring sheets that were holding up 405. Notice how big this rig is compared to the (white) semi truck!
We used the PC-800 to vibro out the temp 40 ft. shoring pile.
Pulling the 8x14 sheets
(Photos courtesy of Matt Elder)
Jun 9, 2008
NiGhT CrEw...
Setting the Girders over Southbound 405 over I-90 at night, due to freeway shut downs. The crane in this picture is a 500 ton, the other crane you don't see is the 450 ton. These are used to pick and set girders that weigh approximately 180,000 lbs. a piece. When project is complete this will be the new overpass for Southbound 405 over I-90.





















