This is my crew and, I drilling shafts, 30 feet deep with our low drill and, then setting our piling which are 40 feet long with our 60 ton crane. This is temporary shoring to hold back, I-405.
For all the Piledrivers, Carpenters, Welders, Crane Operators and, all the other Smashed Thumbs out there!
This is my crew and, I drilling shafts, 30 feet deep with our low drill and, then setting our piling which are 40 feet long with our 60 ton crane. This is temporary shoring to hold back, I-405.



Working on yet another Saturday!
Using a PC-800 excavator where a crane can't fit. Pulling temporary shoring sheets that were holding up 405. Notice how big this rig is compared to the (white) semi truck!
We used the PC-800 to vibro out the temp 40 ft. shoring pile.
Pulling the 8x14 sheets